Trans-Africa Gas Pipelines
146
portfolio_page-template-default,single,single-portfolio_page,postid-146,bridge-core-2.7.6,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-theme-ver-26.1,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-6.6.0,vc_responsive
 

Trans-Africa Gas Pipelines

About This Project

Tanzania is endowed with 57.7 trillion cubic feet of Natural Gas proven reserves. The Trans-Africa Gas Pipelines (TAGP) is an onshore 48-inche cross-border gas pipeline to be co-located within the TAR corridor. TAG shall have an initial throughput of 9-million cubic meters , equivalent to 318-million cubic feet per year.

Date